12/19/2023 0 Comments Bay bridge traffic alerts![]() ![]() The expanded and improved winter condition reporting onĥ now provides more frequent updates over more miles of roadway. Press the "play video" button to view the live camera feed.Look for the camera icons along your route.In the top right corner under the Map Legend and 511 layers box, click “cameras” checkbox.More information is available on the MassDOT GoTime website: Visit online or download the 511 Wisconsin smartphone app. MassDOT GoTime App: Available on all mobile platforms, this app provides real-time travel time information to aid the public in decision making.CapeFlyer Seasonal Passenger Train Service routes and schedules:.Cape Cod Regional Transit Authority schedules, route planner, travel advisories, and other information:.US Army Corps of Engineers Social Media Cape Cod Canal Bridge Alters:.Municipal Road Work Advisories: Barnstable, Falmouth, Mashpee.Construction signs, message boards, arrow boards, drums and police details will be utilized.ĭrivers who are traveling through the affected areas should expect delays, reduce speed, and use caution.Īll scheduled work is weather dependent and/or may be impacted due to an emergency. Standard temporary traffic control operations will consist of lane restrictions and alternating one-way traffic. In addition, landscaping operations will be conducted along the corridor. A shared-use path will be constructed on the north side of the roadway and a five-foot sidewalk along most of the south side of the roadway. The work will also consist of pavement reconstruction, box widening, milling and paving, pavement markings, traffic signal upgrades, new signs, drainage system upgrades and the installation of curbing. ![]() The work will consist of improvements to bicycle, pedestrian, and vehicle access along the corridor. The roadway reconstruction operations will start approximately 1,400 feet west of the Old Barnstable Road intersection and will end at the Mashpee Rotary. The work is anticipated to continue through March 2025. The work will begin on Thursday, Maand will take place weekly, Monday through Friday, during daytime hours from 7:00 a.m. The Massachusetts Department of Transportation (MassDOT) is announcing it will be performing roadway corridor improvements along a section of Route 151 in Mashpee. Weather pending, construction will be on-going, Monday through Friday from 7:00 AM to 4:30 PM until completion of this phase of the project, which is anticipated for August 2024.įor questions, please contact the District 5 Construction Office at 50. Demolition of the old KAM Appliance building is complete. The project will include lane widening/expansion, new sidewalks and pedestrian improvement, new traffic signalization as well as utility improvements, including drainage, water and sewer. The Massachusetts Department of Transportation (MassDOT), working with their contract Northern Construction, will be completing an intersection improvements project at the intersection of Route 28 and Yarmouth Road. MassDOT Route 28 & Yarmouth Road Intersection Improvement Project The roadway will be closed from 8:00PM EDT to 5:00AM EDT daily. ![]() The Massachusetts Department of Transportation (MassDOT) is conducting nightwork on Route 6 between Exit 85 (Old Exit 11): RT-137 and Exit 89 (Old Exit 12): RT-6A. Source for initial work announcement. Updates courtesy of the U.S. USACE would like to thank everyone for their patience and cooperation during this critical repair work that’s needed to maintain the structural integrity of the Bourne Bridge, a vital component to the transportation system of Cape Cod, the Islands and southeastern Massachusetts. The contractor will come back Sunday (November 5, 2023) night to complete permanent line striping and remove all the temporary road signage. Contractors are finishing cleanup of the construction area and have applied temporary line striping on the bridge travel lanes.Īll travel lanes and the sidewalk on the Bourne Bridge are OPEN. Phase 3 included repairs to the sidewalk and structural and roadwork repairs to the travel lanes adjacent to the sidewalk. The contractor completed the waterproofing & paving portion of Phase 3 of the project work late on Novemand removed the lane restrictions. Army Corps of Engineers, New England District announced on Novemthat maintenance work on the Bourne Bridge is complete, more than two weeks ahead of schedule. Traffic Advisoriesīourne Bridge Maintenance Work - Complete Sign up for an account, create and personalize your routes and alerts so you can be notified of event on those routes ahead of time. Mass511 is also provides personalized route recommendations. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |